Your Fibre Installation

MS Fibre have been tasked to complete the pre-enablement works on the date specified in your text message ahead of your high speed fibre connection.

​

Step 1 - Pre-Enablement is the work required to get the fibre from the network up to your property ready for your internal connection.​​​​

IMPORTANT: You do not generally have to be at home in order for us to carry out this work. 

 

However, if the duct or feed is located inside a locked area or a building / garage, or if the area has been built over such as a porch or bin store and it is not easily accessible we will have to push the job back to be rescheduled for when you are at home.

 

If you want to provide our engineers with any information please use the button below.

installs.jpg

Please Note: We are unable to confirm time slots or make calls ahead of our arrival.